Active Tunnelling were awarded phase 3  - Anlaby and East Ella Flood Alleviation Scheme The aim of the project was to prevent over land flooding in the Anlaby and East Ella area. ATL constructed 1350m of 1800mm diameter tunnel with associated shafts and cover slabs, including...

The scheme was required to carry out remedial works on some CFA piles installed by the client, the piles failed due to concrete separation during installation. ATL had the solution of carrying out a heading along the existing line of piles to expose them at the...

The scheme was required to address the Unsatisfactory Intermittent Discharge (UID) from Tyldesley WwTW, The treatment works discharges in Astley Brook and the UID designation was on the basis of aesthetic and river impact grounds. The UID was to be resolved during the AMP5 phase...