Archive

The Ravenhill Avenue Flood Alleviation Project in Belfast, delivered by NI Water as part of the £7 million ‘Living With Water Programme’, aimed to reduce the risk of property flooding in a densely populated urban area with outdated sewer infrastructure. A new 1800mm combined sewer...

The £22 million Stroud Sewerage Strategy Project (Part 2), led by Severn Trent and Galliford Try, aims to reduce sewer flooding and improve the health of the River Frome by upgrading Stroud’s sewer infrastructure. The project includes 3.65km of gravity-fed trunk sewer—built using a mix...

Johnson Street Storm Overflow Screening Project (Gateshead, 2022) Commissioned by Northumbrian Water, the Johnson Street Storm Overflow Screening Project in Gateshead aimed to improve water quality in the River Tyne by reducing unscreened storm discharges from a 22,500-population catchment. Delivered by the Esh-Stantec JV, with shaft...

Kier Utility (working for Costain on behalf of Highways England) required a new 1500dia concrete sleeve installing under the A30 (near Truro) as part of the A30 Chiverton to Carland Cross road improvement scheme. The 1500dia concrete sleeve was to allow 2 x 710mm dia plastic...

Active Tunnelling were awarded phase 3  - Anlaby and East Ella Flood Alleviation Scheme The aim of the project was to prevent over land flooding in the Anlaby and East Ella area. ATL constructed 1350m of 1800mm diameter tunnel with associated shafts and cover slabs, including...